HEATHROW’S 2018 CONSULTATIONS

Heathrow consultations finished on March 28th

Heathrow Airport held two key consultations. One set out options for construction around a third runway in the more immediate area of the airport including a possible shorter runway, moving part of the M25, changes to the local road lay-out and compensation for the Heathrow villages.

The other set out options for the principles which inform the design of the extensive flight path changes, driven by new technology, which will be brought in whether or not a third runway is built.

Read the official HACAN response to the airspace consultation:  http://hacan.org.uk/wp-content/uploads/2018/03/HACAN-Response-to-Heathrow-Airspace-Consultation-1.pdf

Read the official HACAN response to the expansion consultation: http://hacan.org.uk/wp-content/uploads/2018/03/HACAN-response-Heathrow-consultation-expansion-1.pdf

Read the response from HACAN East: http://hacan.org.uk/wp-content/uploads/2018/03/HACAN-East-response-to-Heathrows-Airspace-Consultation-1.pdf